1. To edit a Metric currently aligned with an investment, navigate to the Component to which the Metric is assigned.
- From the Portfolio menu, select 'Components' and filter on the desired Investment.
- Select desired component from the returned list.
2. Select the Metrics tab on the Component page and filter on metric to be edited.
- Click on the desired metric.
- Click 'Edit Performance Metric' option at the top of the screen.
3. To retire a metric, scroll down to the bottom of the screen and slide the 'Is Metric Retired' Toggle over to 'Yes'. (Skip this step if metric is not set to retire.)
- Once all information has been edited, select 'Save'.
Comments
0 comments
Please sign in to leave a comment.